At Flower Power’s Glenorie site, movement is constant.
Operating within the green life industry, the team processes and moves over 8 million plants annually. With that volume comes a continuous requirement: moving and dispatching plants efficiently, safely, and without disrupting the wider operation.
To support this, Flower Power partnered with Sitecraft to introduce a Motrec MP240 electric tow tug, configured with a rear bumper 6-hole hitch to integrate directly with their existing trailer fleet.